TMC MINI MISSION-IV (MODERNIZATION OF G & P
FACTORIES)
|
Similarly,
components, eligibility criteria and norms of an Ideal G & P factory have been developed. The
same are as follows: |
(1) IDEAL
G & P FACTORY
A. Essential
Machines:
-
Saw gins or
double roller gins with auto feeders (single roller gins
not permitted)
-
Precleaner
-
Lint Cleaner
-
Mechanical/Pneumatic Conveyor System for transfer
of kapas from heaps to Precleaner(s) and from Precleaner(s) to individual
gins. Central platform system not permitted unless it is already
existing.
-
Mechanical / Pneumatic Conveyor System for
carrying lint from Gin House to Lint Cleaner, from Lint Cleaner
to Pala Halls and from Pala Halls to Press Hall. In case of a new Bale
Press, direct feeding from Pala Halls to the Press box. In case
a factory des not need Pala Halls, lint can be directly taken from
Lint Cleaner to Bale Press.
-
Bale Press with the following characteristics
(in case of new installation)
- Single stage operation
- Built-in Autotramper
- Oil hydraulic system
- Lint Slide and Pusher mechanism
- Press box dimensions meeting BIS requirements
Existing presses without
the first four features will, however, be permitted.
- Conveyor for carrying seed from Gins to seed platform
outside
- Humidifiers/ Moisturizers to maintain standard moisture in kapas in
the Gin Hall and in lint in the Pala Halls and Press Hall/ Lint Slide
- Fire fighting system comprising Overhead Tank/ Sump, Pump
with stand-by Diesel pump and Hydrants with Hose pipe and Nozzles
- Underground wiring/cabling both inside and outside buildings
- Weigh bridge (need not be installed if the facility is available
nearby
|
B. Essential
Infrastructure:
- Weigh bridge (need not be installed if the facility is available
nearby)
- Storage space for kapas
- Storage space for lint (Pala House)
- Storage space for seeds
- Storage space for bales
- C.C. Road
- Boundary wall/fence
- Any other item/ items approved by TMC
|
C. Essential Conditions:
- Quality awareness boards to educate workers
- Headgear/ cap for workers
- Periodic training for gin operators/ technicians on maintenance and
repair of machines
- Arrangements for regular disposal of rubbish as soon as it accumulates
- Gummed boards to stick human hair picked up from floor, cotton heaps
etc.
- Variety-wise and grade-wise heaping and ginning of cotton
- Insistence on covering of cotton brought in carts, tractors and lorries
- Bale packaging as per BIS specification
- Gin/ Press fitters in each shift
|
D. Desirable Machines:
- HVI for cotton testing
- Generator(s)
- Laboratory model gin
- Ginning Percentage Balance
- Moisture Meter
- Workshop machines and tools
- Roller grooving machine
- Pod opener / Kala machine
- Any other machine subject to TMC approval
|
E. Desirable Conditions:
- Bales to be covered with cotton cloth
- Press house to be close to gin house
- G&P Units to be in co-operative sector
|
(2) ELIGIBILITY
CRITERIA
This
subsidy scheme is available for setting up of new G & P factories as
well as modernization or expansion of existing units.
The following units are eligible to apply
for modernization:
- A Composite Unit intending modernisation of machinery
or civil infrastructure, or both
- A ginning unit desirous of installing a bale press
to make it a composite unit or a pressing unit interested in setting
up ginning facility;
- A factory interested in capacity expansion by addition
of more ginning machines.
- TMC insists on total modernisation. This means that
after modernisation the factory should possess all Essential Machines
and Essential Infrastructure listed below and must satisfy all Essential
Conditions. A Unit proposing modernisation or being set up with TMC
assistance should be willing to maintain all records and furnish
all returns to the concerned authorities TUF/TMC.
It
is also necessary that the Unit does not avail of assistance under TUF
scheme or any other subsidy scheme of the Government of India. |